BC Transit Alrt Tunnel, New Westminster, BC

BC Transit's Light Rapid Transit (Skytrain) line dips underground as it passes through New Westminster near the sky bridge.  As Prime Consultant to BC Transit, CWMM designed the 590 foot (180 metre) section of tunnel and retaining structures west of the Columbia Station, as shown above.  With a construction cost of $70 million, this project involved substantial utilities relocation, underpinning, and support of existing buildings in relatively poor soil conditions during construction.


  

Great Bear Snow Shed, Coquihalla Highway, BC

The most impressive structure on the Coquihalla Highway, the Great Bear Snow Shed is locate in one of the highest snowfall regions of the Province.  with a total length of 920 feet (280 metres), and 36 foot (11 metre) high portal walls, the structure shelters 6 lanes of freeway traffic from the threat of snow avalanches.  Prestressed concrete was used extensively on this project, far from any urban center.  CWMM utilized a wealth of i-house past experience designing avalanche structures to produce a sleek and cost-effective design.


  

Skeena Tunnel, Cassiar Connector Project, Vancouver, BC


 

 

                                                            ©2004 CWMM Consulting Engineers Ltd. All Rights Reserved