CWMM

CWMM Consulting Engineers Ltd.

  • English
  • 中文
  • Home
  • About Us
  • Buildings
    • Residential
    • Commercial
    • Highrise
    • Health Care
    • Educational
    • Institutional
    • Religious
    • Sports & Recreation
    • Seismic Mitigation & Condition Assessment
    • Special Structures & Heritage
  • Bridges & Infrastructure
    • Highway Bridges
    • Bridge Assessment/Rehabilitation
    • Pedestrian Bridges
    • Retaining Walls/Avalanche structures
    • Culvert Structures
  • Urban Planning
    • Tourism Planning
    • Urban development and strategic planning
    • Residential planning
    • Industrial & Commercial Park Planning
    • Green-space planning
    • Urban design
  • Landscape
    • Scenery Tourist Landscape
    • Park Landscape
    • Residential Landscape
    • Public Architectural Landscape
    • Street Landscape
    • Campus Landscape
    • Sustainable Landscape
  • Awards
  • Contact Us
  • News
  • Careers
 
特种的结构与文化遗产
  • VIA Rail Building
  • Seismic assessment the Sinclair Centre
  • Palace Grand Theatre Foundation Replacement & Upgrade
  • BC Museum of Mining Modernization Project Concentrator Building #3
  • Steveston Sandhead Lightstation Repair
  • Floating Breakwater Improvements
  • ASDE Antenna Replacement
  • Vancouver International Airport Air Traffic Control Tower
  • Trenton Air Traffic Control Tower
  • Comox Air Traffic Control Tower

Steveston Sandhead Lightstation Repair

Richmond, B.C. Canada


Sandheads灯塔在2000年被重建。它有一个12.5米 x 6.44米高架桩基混凝土承重台,由350mm厚预制混凝土板,及100mm 到150mm厚混凝土面层,由520mm×990至1040mm深压顶梁支撑,反过来,可以用508mm直径垂直式钢桩支撑。所有钢桩整条被混凝土填满。钢筋笼由底延伸到压顶梁,以结合桩和桩压顶梁在一起。
在2006年一月中旬,发生了损害到Steveston Sandheads灯塔的事故,当驳船试图想办法越过灯塔时与灯塔相撞。